UZIN products were used to install over 6000 m2 of flooring at the new Buckland Hospital in Dover. The hospital is committed to providing the highest standards of health care, so required an environmentally friendly solution for the refurbishment. The flooring contractor, Oxden Floors therefore selected UZIN’s products to ensure that these health standards were upheld. The new two storey hospital provides safe, patient focused and sustainable health services. The new facilities include a wide range of co-located diagnostic services as well as renal dialysis, child health and minor injury services.
A suitable range of EC1 and solvent-free UZIN products were therefore used for the installation. Some cracks in the substrate were repaired using UZIN RR 2013 crack repair, UZIN NC 182 rapid and UZIN NC 888 feather coat. The substrate was then protected against residual moisture using UZIN PE 414 DPM, followed by UZIN PE 280 primer. UZIN NC 150 smoothing compound was then used, before the floor coverings were installed. UZIN KE 2000 S was used to install the safety flooring, while 3200 linear metres of set in and coved skirting were adhered using Remur tape. The job was exceptionally well finished resulting in a sound and durable floor.